LULULEMON
CASE STUDY: STORE ROLL-OUT AND INSTALLATION
Lululemon New Store Rollout & Installation
Client Need
Implementing two distinct fully turnkey programs for Lululemon, involving the installation of the MIRROR® program in existing stores and the deployment of a comprehensive technology package in new stores.
The challenge involved orchestrating the seamless installation process, performing thorough pre-construction assessments, and efficiently overseeing the management of cutting-edge technology equipment from various vendors.
DAVACO'S SOLUTION
DAVACO executed a comprehensive strategy for Lululemon, conducting pre-construction store site surveys, installing framed drywall backdrops for the MIRROR® program, and deploying a new store technology package.
The solution involved configuring and testing technology hardware, fabricating custom data racks, and coordinating smart hands installation to minimize on-site configuration efforts.
Full Fleet In-Store MIRROR® Program Activation Installation
- Pre-Construction Site Surveys & Matterport 3D Walkthroughs
- Phase 1,225 Store Installation Roll-Out
- Fabricate and Install Framed, Drywall Backdrop
- Pull and Run Power and Data Cabling to Install Location
- Paint and Finish New Backdrop Wall Installation to Match Existing Site Decor
- Coordinate On-Site Technology Support Provider
- Install and Configuration of Lululemon MIRROR® Product
New Store Technology Package Deployment
- Receive and Inventory Technology Hardware from Multiple Vendors for Pre-Site Consolidation
- Configure and Test all Equipment with Store-Specific Configuration
- Fabricate and Install a Custom 2-Post Data Rack with all Back End Store Equipment; including Configuration, Testing and Labeling
- Rack and technology components shipped to store and install
- Pre-Site Prep Minimized Configuration for Equipment On-Site; Smart Hands Installation
Client Benefits
- Seamless MIRROR® Program Activation
- Efficient New Store Technology Deployment
- Customized Data Rack Fabrication
- Minimized On-Site Configuration Efforts
- Coordinated Program Execution